Water park and swimming pool
at Beau Rivage campsite

Two aquatic areas for a pleasure multiplied by two!

From July 1, 2022, the Beaurivage campsite will have not one, but two aquatic areas!

The current swimming pool of the campsite will be entirely dedicated in high season to adults who wish to recharge their batteries in a calm and relaxing space.

The new water park will be based on three main structures: swimming in the heated outdoor pool with a whirlpool for maximum relaxation, slides, and a Splash Park!

You can enjoy the beaches around the swimming pools on the armchairs and sun loungers at your disposal.

Get ready, our activities team also offer plenty of water activities and water polo tournaments !

Indoor and heated swimming pool

Open from mid-April to mid-September (depending on weather conditions).

Our current indoor heated pool will welcome you for a relaxing or pleasure time.
The area of the pool is 100m² with a depth of 30cm to 170 cm.
Enjoy this relaxing moment, you’ve earned it!

In high season, this space will be dedicated exclusively to adults.

Aquatic space for all

The new space will open on 1 July!
An XXL size pool with a pool of 200m² will give you moments of relaxation and pleasure with its bench equipped with a whirlpool.

A 110m² Splash Park in which children can play among giant insects and various water games safely!

Finally, for the greatest pleasure of children and adults, 4 slides, including a double loop and a descent of 60m will guarantee you extreme sensations!

Shorts, Bermuda shorts and saron are prohibited for reason of hygiene.
For the safety of all, wearing the bracelet is mandatory. The pool area is not supervised, the children are under the responsibility of their parents.

The 2 aquatic areas are open from 10:30a.m. to 7p.m. every day.

logo-fixed
Beaurivage – Camping & Lodges ****
15 rue Claude Decloitre
03700 Bellerive-sur-Allier

From July 1, 2022, the Beaurivage campsite will have not one, but two aquatic areas!

Follow us on social media to be the first to be informed of the progress of the project!